Norfolk Southern - Mainline Fueling Expansion

Elkhart, IN

The Mainline Fueling Expansion project included new construction for a pump equipment building. GAC provided demolition services to remove existing pipes, tanks, filters, and pumps. Construction services included installing up-to-date ventilation, louvers, floor drains, the sump pump, an 8” diesel fuel line, and the relocation of the generator and fuel tank, ductwork, louver, generator muffler system, and roof stack. GAC utilized a lull, crane, and JLG lift to work on the pipe bridges.

 

Client: Norfolk Southern Railroad
Architect: Urban Engineers
Industry: Railroad